ACI 336.3R-93-Design and Construction of Drilled Piers

ACI 336.3R-93-Design and Construction of Drilled Piers

Construction methods described include excavation, casing, placement of concrete and reinforcing steel, and installation by the slurry displacement method. Criteria for acceptance are presented along with recommended procedures for inspection and evaluation.

 

Contents: 

Chapter 1-General
Chapter 2-General considerations
Chapter 3-Design
Chapter 4-Construction methods
Chapter 5-Construction inspection and testing
Chapter 6-References

Free dowload ACI 336.3R-93-Design and Construction of Drilled Piers

Download Mirror 01  Mirror 02  Mirror 03  Mirror 04

ACI 336.3R-93-Design and Construction of Drilled Piers
Rate this post

Leave a Reply

Your email address will not be published. Required fields are marked *

6 + 7 =